Tunnel Achrain

Tender and detail design, consulting
  • Length: 2240 m, two-lane road tunnel
  • Excavation area: 124,5 m²
  • Total costs: € 65 million
  • Construction time: 2000–2008
The major part of excavation is in the so-called “Weissachschichten”. These sediments belong to the fresh water molasses, comprising marls with sandstone layers of different thickness.